Renovation progress is a bit slow but I hope it will be worth it. Guess other owners are rushing to complete their flats by this year.
The false ceiling are done and wall tiles (for kitchen and both toilets) are almost complete. Waiting for the window and window grills to go up before they tile the area around the window opening.
fThe False ceiling are done. Where’s the lights?
The balcony has been leveled with the living room’s floor. Metal netting in place for more support
The kitchen wall tiles are (almost) done
New rubbish chute. Serene told me that it will be pink unless I stick something over it.
The wall tiles in the common toilet. I like how the color combination turn out
Tiles are soaked in water to remove the air bubbles. Something interesting eh?
Master bedroom toilet wall tiles with a strip of mosaic
A closer look at the wall tiles. There’s design on it.